Xiao-Yun Lu's Projects

  • Automated Vehicle Merging

  • Automated Truck Control and Automated Vehicle Coordination

  • A Combined Quantitative and Qualitative Approach to Planning for Improved Intermodal Connectivity at California Airports (TO5406-6406)

  • Highway Traffic Data Sensitivity Analysis

  • Deliver a Set of Tools for Resolving Bad Inductive Loops and Correcting Bad Data

  • Development and Evaluation of Selected Mobility Applications for VII (PDF)

    • Improving Highway Corridor Traffic Throughput and Safety by Combined Variable Speed Limit (VSL) and Coordinated Ramp Metering (CRM)
    • Automated Multiple Truck Control Based on DSRC Coordination
  • Feasibility Study for Using Bay Area Rapid Transit (BART) System for Air Freight Movement

  • Coordination of Ramp Meters and Traffic Signals for Better System Management

    • Phase 1: Coordination of Freeway Ramp Meters and Arterial Traffic Signals Field Operational Test (FOT)
    •  Phase 2-A: Coordination of Freeway Ramp Meters and Arterial Traffic Signals (Modeling and Simulation)
  • Active Traffic Management (ATM): Combined Variable Speed Limit/Advisory (VSL ) and Coordinated Ramp Metering (CRM)

    • Phase 1: Preparations for Field Testing of Combined VSL/VSA and CRM for Freeway Traffic Control
    • Phase 2: Field Testing of Combined VSL/VSA and CRM for Freeway Traffic Control
  • FHWA STOL Project, Task 2: Speed Harmonization

  • FHWA EAR Program Project: Truck CACC (Copperative Adaptive Cruise Control) Implementation and Field Testing

  • FHWA EAR Program Project: CACC (Copperative Adaptive Cruise Control) Simulation

  • FHWA Saxton Lab Project: CACC (Copperative Adaptive Cruise Control) Implementation and Field Testing

  • Caltrans DRISI Project: Traffic Congestion Responsive Ramp Metering, Caltrans Project